Case

So far, we have provided products and installation services for over 100 construction projects, which have been unanimously recognized by our clients.

Suzhou anti-seepage project

EBSTSZSX01 project in Suzhou City, including pile shaping and anti-seepage engineering.

Li Jiagou tailings leachate collection pool anti-seepage treatment project

The anti-seepage renovation project of Lijiagou tailings leachate collection pool of Wengfu Dazhou Chemical Co., Ltd.

Huoshan County Domestic Waste Landfill Closure Project

Vertical anti-seepage project for the closure of Huoshan County's domestic waste landfill site

Yongzhou Southern Domestic Waste Incineration Power Generation Project Fly Ash Landfill Site

The fly ash landfill project of Yongzhou Southern Domestic Waste Incineration Power Generation Project.

Tianjin Zhongxin Ecological City Project

The Tianjin Zhongxin Ecological City Island Building Project has supplied a total of 380000 square meters of GCL products and successfully treated heavy metal red mud pollutants for the first time in China.

Foshan Gaoming District Landfill Site

The Gaoming District landfill in Foshan has supplied a total of 250000 square meters of GCL products for the landfill's anti-seepage system.

Thailand Tianjia Company Bangkok Project

Tianjia Company's Bangkok landfill has supplied a total of 500000 square meters of GCL products for the landfill's anti-seepage system.

Tianjin City Hot Spring Resort Project

The water system project of Tuanbo Hot Spring Resort has supplied a total of 20000 square meters of GCL products for artificial lake anti-seepage.

Hulunbuir Economic Development Zone Project

The Hulunbuir Economic Development Zone landfill site has supplied a total of 120000 square meters of GCL products for the anti-seepage system of the landfill site.

Ninghe Vertical Anti Seepage Barrier Project

The closure project of Ninghe Fengzhuangzi informal landfill site has a GCL vertical anti-seepage barrier with a thickness of 60cm, a length of about 580 meters, an average depth of about 20.6m, and a closure area of about 18000 square meters.

Zhenhai District Houhaitang Landfill Treatment Project - Vertical Barrier

The scope of the Houhaitang landfill project in Zhenhai District, Ningbo includes a circle around the storage area, with a total horizontal length of 1606m, a depth of 12.9-22.7m, and an average depth of 16m. The structural form adopts GCL composite verti

Hainan Yanchunling Municipal Solid Waste Site Environmental Governance and Ecological Restoration Project Vertical Curtain Barrier Engineering Composite Anti Seepage Wall Special Construction Project

The GCL blanket professional project of the vertical curtain barrier engineering composite anti-seepage wall special construction project for environmental governance and ecological restoration of the Yanchunling domestic waste landfill in Chengmai County

Our Partners

Win win cooperation and co create the future